Click to return to home page
 
 

 

Electrical Contractor's Office

BS 7671 18th Ed (Amd2)
 EV Charging Point Certificates

 

Certificates included

  • Residential EV Charger Self Survey

  • EV Charging Point Installation Certificate

  • EV Charging Point Condition Report

  • Checklist for EV dwelling installations

  • Distribution Board pages can be added to both EV Charging Point Installation Certificates and EV Charging Point Condition Report Certificates

  • Guidance Notes

 

Features included

  • Automatically display your company logo at the top of certificates

  • Client and Site Database - to fill in the form in seconds

  • Integrated Contractor database and stored electronic signature facility (see below)

  • Date Selector

  • Save the forms to the cloud and share with your staff. 

  • The certificates can be quickly converted to PDF for you to securely email to the client. 

Dropdown boxes allow you to fill the certificates quicker. 

 

 

It is easy to add to a Distribution Board page to the end of the Certificates


We have included a button to quickly add PASS to each cell of the inspection Schedule
 


Easy to add photos to the certificate such as fuse board, EV Charger location.

There is also a facility to rotate images and add a caption under each one.

 

Purchase Electrical Contractor's Office

 £275

Pay online

Click to order   
Note: If you only require the EV Charging Forms, you can purchase Form Filling Simplified for £175


Pay by phone with Instant Download

Please call us on 01455 891869 
 

Prerequisites for installing “Electrical Contractor's Office” software
Microsoft Office 2010 or above needs to be loaded on the computer system(s)

Compatible with Windows computers including Windows 11.