Electrical Isolation Certificate
Controlled isolation for safe electrical work
This form provides a clear, auditable record for planning and controlling electrical isolation on existing installations. It captures equipment details, the isolation requirement, the specific isolation actions taken, and formal handover / return-to-service sign-off.
What the certificate covers
- Equipment details (plant/location, equipment to be isolated, other equipment affected, work order)
- Isolation requirement (switch-room, panel/cubicle, rack)
- Details of isolation actions (e.g. fuse removed, isolator off, MCB off, racked off, padlocks and tags fitted) with notes, date and time
- Handover for service with prove-dead confirmation by an Electrically Authorised Person
- Point-of-work prove dead test by an Electrically Competent Person
- Return to service sign-off by an Electrically Authorised Person
- Additional comments and recipient notes
Software features to save you time
Client and Site Database
Select client and site details directly from your database - no retyping, no inconsistencies, and no missed information across multiple forms.
Integrated Contractor Database & Electronic Signatures
Pull inspector details from your contractor database and insert electronic signatures directly into the record for a professional, completed document every time.
Built-in Date Selector
Quickly insert inspection dates and next test dates using an integrated date selector, reducing typing errors and speeding up form completion.